CSMS Message: 15-000953

Title:ACE PRODUCTION Deployment, Saturday, December 19, 2015 from 2200-0400 ET
Date:2015-12-18
To:abi,air,export,newace,ocean,partner,rail,truck
Links:previous, original, next

Please be advised that there will be an ACE PRODUCTION outage Saturday, December 19, 2015 starting 2200 ET and ending Sunday, December 20, 2015 at 0400 ET.

This deployment will impact ACE Entry Summary, ACE Cargo Release, and ACE Manifest.

To be deployed:

ACE Cargo Release and ACE Entry Summary:
• PGAD-8975 BUG - Fix XML Generation Issues
• PGAD-8958 BUG - incorrect PGA line status being sent on SO70

ACE Manifest:
• CAOM-294: Fixed Type 63 Inbond for Express House posts as a type 62 inbond.
• CAOM-614: TT# 2003162: Delete Exported In-bond (TRN000) should reopen a BOL
• CAOM-637: TT# 1972557: In-bond not on file reject for FTZ Admission
• CAOM-871: Allow Mass Posting of Air express bills at in-bond destination port
• CAOM-991: TT# 1997123: Correct In-Bond Type determination for House In-bonds when CCL Airport sent
• CAOM-1001: Fixed FER/199 when two express BOLs came in at very same time to the millisecond for same entry
• CAOM-1015: Fixed Notifications failures due to missing mandatory district port; also for Pipeline bills with FTZ
• CAOM-1040: TT# 2104817: Fixed QT response incomplete for multiple QP10 Deletes

Summary:

This release will include some infrastructure upgrades, as well as miscellaneous BUG fixes, specifically:

Currently if an entry is accepted with FDA data, the XML is generated immediately and if outside the "5-day window" it is held. The process that looks to pick up the XML once the 5-day window is reached only looks back up to 7 days. As a result, if an entry is filed 60 days prior to arrival, the process that looks for the generated XML will not find it. System needs to look back 60 days.

Fix SO70 Entry level PGA status to always reflect the highest severity status detected in all lines for a given PGA.