Title: | ACE SYSTEM FAILURE IN ACE PRODUCTION, FRIDAY MARCH 24, 2017 |
---|---|
Date: | 2017-03-24 |
To: | abi,newace |
Links: | previous, original, next |
Please be advise that CBP is aware that the Trade is receiving ACE System Failure responses in ACE Production transmissions Friday, March 24, 2017.
We do not have an ETA on the fix at this time.
A follow-up CSMS message will be issued when the fix has been deployed.