CSMS Message: 17-000223

Title:ACE PRODUCTION ES Deployment, Thur Apr. 20,2017 @0500ET,impact ACE CargoRel & EntrySummry
Date:2017-04-19
To:abi,newace,partner
Links:previous, original, next

Please be advised that there will be an ACE PRODUCTION Entry Summary deployment on Thursday morning, April 20, 2017, during the 0500 - 0700 ET window, which will impact ACE Cargo Release and ACE Entry Summary processing.

To be deployed:

ACE Entry Summary (AE message) Validations
------------------------------------------
• CES-6979: Errors when converting ‘01’ with Recon/Other Recon to ‘03’.
When editing a summary to convert entry type ‘01' with Recon to ‘03’, Entry Summary Validations was rejecting the summary updates with error OTHER RECON NOT ALLOWED – ENTRY TYPE (condition code 160) when there was no FTA (Free Trade Agreement) or Other Recon. Converting the entry type is now allowed.

• CES-7074: Allow change from Temporary In-bond (TIB) 23 to 01 in Entry Summary (ES) Change or Post-Summary Correction (PSC) scenario.
When an ACE ES in CBP Control-Rejected is being corrected or when applying a PSC, or correcting an existing PSC in CBP Control-Rejected, error ENT TYP CHNG NOT ALLOWED POST ACCEPTANCE or PSC ENTRY TYPE CHANGE NOT ALLOWED was received when changing from Entry Type 23 to Entry Type 01. This entry type change is now allowed.

Referenced By

CSMS #17-000240, 17-000228