CSMS Message: 17-000584

Title:COMPLETED: ACE PRODUCTION, Sat. 9/16/2017 2000-0330 ET Sunday,9/17/2017 for Release G2
Date:2017-09-17
To:abi,acee,acep,acer,air,export,newace,ocean,partner,rail,truck
Links:previous, original, next

The ACE Production Maintenance window completed at 3:30 AM, Sunday 9/17/2017.

The following functionality were successfully implemented in Production.

Entry Summary and initial deployment of NAFTA Duty Deferral
-----------------------------------------------------------
• CIP-756: NAFTA Duty Deferral
• CIP-911: NAFTA Duty Deferral - Online Edit

• CES-7543: Exempt HTS chapters 9804-9807 and 9809 from Harbor Maintenance Fees (HMF) when MOT = 12.
When the MOT is 12 (Barge) and any HTS number of the line is in HTS chapter 9804-9807 or 9809, HMF is exempt.

• CES-7616: Apply 90-Day Future Print Date Restriction for PMS.
Currently the validation that ensures that the reported Preliminary Statement Print Date is no more than 90 days in the future is only applied when Payment Type Code is 2, 3, or 5 (daily statement). The same validation needs to be applied when Payment Type Code is 6, 7, or 8 as well (monthly statement - PMS).

• CES-7907: Revise PSC (Post-Summary Correction) Collection Restrictions for 21, 22.
Currently Entry Summaries of all Entry Types are allowed to be amended via a PSC. Problems, however, have arisen when the types are 21 and 22. This is because the underlying liquidation and collections status settings (all from ACS) are different from all other types. The FAC PSC Collected Revenue Restriction shall change to correctly accommodate PSC processing:
Bypassing of validation for types 21 and 22 as they remain in partial payment status until the final withdrawal is collected.

• CES-8011: Conventional Rejected ES Statement Window Restrictions.
The FAC 'Conventional Rejected Entry Summary Statement Window Restriction' (6.2.4) validation is slated to be removed when ACE takes over statements (currently scheduled for December 2017). In the interim, while statements are still being executed in ACS, the validation needs to be in place. This story covers the work needed to enable the validation now, yet can be turned off/disabled when ACE statements takes over.

Related CSMS No. 17-000576