Title: | ACE PRODUCTION Scheduled Maintenance, Sat. Mar 2, 2019@ 2200 to 0400 ET Sun. Mar 3 |
---|---|
Date: | 2019-03-01 |
To: | abi,acep,acer,air,export,newace,ocean,partner,rail,truck |
Links: | previous, original, next |
Please be advised that there will be ACE PRODUCTION Scheduled Maintenance Saturday evening, March 2, 2019 from 2200 ET to 0400 ET Sunday, March 3, 2019 for ACE Infrastructure maintenance and the following ACE Deployments:
ACE PGA/ITDS - DIS (Document Imaging System)
------------
• Perform lookup validation on IOR (importer of record) number for CBMA (Craft & Beverage Modernization Act).
ACE Statements
--------------
• Fixed: Statements application re-routed a large number of duplicates to unrelated filers during MO message re-route.
ACE Drawback
------------
• For filing ACE Drawback claims, allow Loop maximum of 10,000 lines for drawback sections that are currently limited to 5,000 lines.
ACE Protest User Interface (UI)
--------------------------
• Input length validation added for ‘Reason for Protest’.
• Ticket #10083119-Fixed issue with protest Count when sorting by columns.