CSMS Message: 19-000143

Title:ACE PRODUCTION and CERT Drawback & Recon Deploys, Thur 3/21/2019 @0500ET
Date:2019-03-21
To:abi,newace
Links:previous, original, next

There will be ACE Drawback and Reconciliation items deploying to the ACE PRODUCTION and CERTIFICATION environments this morning, Thursday, March 21, 2019, during the 0500 - 0700 ET window. To be deployed:

ACE Drawback
------------
• TFTEA claims that are re-filed to add Accelerated Payment (AP) were not sending update to ACS.

ACE Reconciliation
------------------
• Ticket# 11964603: Remove validation of Recon bond rider on underlying summaries when a Recon Summary is filed.
When Reconciliation summaries are filed, ACE was validating all of the underlying summaries and requiring that they have a valid Reconciliation Bond Rider on the associated bond. This validation is already done at the time of filing the underlying entry summaries, so no need to validate again.

• Fix for Reconciliation summary rejection F202 error "UNDRLYG ES LINE DOES NOT MATCH ROLL UP" on an entry line where the SPI code value was a single character. There was a problem when comparing the SPI codes between the incoming Recon entry against its existing Recon entry.

Referenced By

CSMS #19-000162, 19-000151