CSMS Message: 16-000120

Title:ACE PRODUCTION OUTAGE, Saturday, February 13, 2016 @ 2200 to 0400ET Sunday, February 14
Date:2016-02-12
To:abi,acep,acer,air,newace,ocean,partner,rail,truck
Links:previous, original, next

Please be advised that there will be an ACE PRODUCTION outage Saturday evening, February 13, 2016 starting 2200 ET and ending Sunday, February 14, 2016 at 0400 ET.

ACE Deployments will take place during this time. To be deployed:

Legacy ACE (ACE Manifest and ACE Accounts)
------------------------------------------
• CAOM-618: MEWS FIRMS bills - Suppress 1C Notifications after Deletion of BOL or Cancellation of the MEWS FIRMS.

• CAOM-1272: PMS - Fixed Importers getting erroneously deactivated from periodic monthly statements when attempting to update their accounts.

PGA
---
• PGAD-9615 BUG- Validations for below FDA Business rules returned incorrect rejects or no results:
(1) FDA FOO- For certain product codes there must either be Can dimensions provided in the PG28 or two AoC codes (FCE, SID) provided in PG23 records.
(2) FDA FOO- For scenario where it is a PN product code but the filer provided the PNC# in the PG14, a rule required the source type code '262', which should not be required for 'FEE' processing code. It should only be required for 'NSF' processing code.
(3) FDA DEV- For scenario where it is a radiation emitting medical device. The rule was updated to include the RAD AoC codes, since those are allowed under RED processing code.
(4) FDA DEV- Trade received PJ8 error (MSNG OR INVLD STATE OR PROVINCE PER PGA) despite having 'QC' in the state/province field with 'CA' as the country. All data appeared in the correct positions.

• PGAD-9626 BUG- SO70's that are the result of bucket 2 processing are going out across many SO messages.
The SO70's for certain PROD entries that are a result of bucket 2 processing are all going out on separate SO messages (i.e. one SO70 per line). However, the SO messages that go out after an event is sent are all going out on one SO.

• PGAD-9627 If multiple FDA lines present on entry and ALL have been issued a MAY PROCEED, ensure that the PGA Entry Level Review status also says MAY PROCEED for each SO70 message.
Despite trade receiving a PGA line level review status with a MAY PROCEED in the SO70, the entry level status was reflecting UNDER REVIEW (for example) on every SO70 except for the last one (associated to the last line). This was confusing and difficult to interpret for the trade.