CSMS Message: 16-000121

Title:ACE PRODUCTION deployment Tues. February 16, 2016 0600ET, impact ACE CargoRel & EntrySumm
Date:2016-02-15
To:abi,newace,partner
Links:previous, original, next

Please be advised that there will be an ACE PRODUCTION deployment on Tuesday morning, February 16, 2016, starting at 0600 ET.

The deployment is expected to take approximately 30 minutes, and will impact ACE Cargo Release and ACE Entry Summary processing.

To be deployed:

• PGAD-9628 BUG - Update the generated and saved correlation-ID to be unique for each specific EntrySummary instance flowing through ACE.
Currently, the correlationID which is used to track each Entry Summary flowing through ACE is not unique, causing difficulty in capturing and maintaining the status of each EntrySummary received in ACE from Trade. This issue will be fixed in two phases. In PHASE-1, ITDS will use the entrySummaryIdentificationNumber as a temporary unique correlationID. In phase-2 (permanent fix), Team Phoenix will generate, save and pass a unique correlationID to each system as the EntrySummary flows through ACE.

Referenced By

CSMS #16-000127