CSMS Message: 16-000673

Title:ACE PRODUCTION OUTAGE, Saturday August 6, 2016 @ 2200 to 0400 ET Sunday, August 7
Date:2016-08-05
To:abi,acep,acer,air,export,newace,ocean,partner,rail,truck
Links:previous, original, next

Please be advised that there will be an ACE PRODUCTION outage Saturday evening, August 6, 2016 starting 2200 ET and ending Sunday, August 7, 2016 at 0400 ET.

ACE O&M (ACE Manifest, ACE Portal, ACE Accounts, ACE Reports) and PGA teams will perform infrastructure maintenance activities, and the following ACE Deployment will take place during this time:

ACE Entry Summary
-----------------
• CES-5587: Turn off FIRMS validations.

Presently the severity of the following FIRMS code validations is set to “I” (Informational). We will turn the validations off until further notice and restore the severity back to “F” (Fatal) at a later time.

172-FIRMS CODE UNKNOWN
174-FIRMS NOT A CARGO LOCATION
175-FIRMS NOT AN ACTIVE FACILITY

• CES-5584: Bypass LPC Validations for Steel (LPC Code 01).
Until requirements are finalized for steel LPC validations, we want to bypass the validations. Presently the validation is returning an “I” (Informational) message. This change will bypass the validations altogether so no message will be returned.

• Ticket 2675903/CES-4965: ACE accepted Entry Type 06 with MPF of $796.79 which is > the maximum amount of $485.
The validation for Formal MPF Maximum Amount Required ($485) was not being generated correctly. The rule applies to formal MPF's which includes these entry types: 01, 02, 03, 06, 07, 21, 22, 23, 31, 32, 34, 38, 51, 52.